AUTUMNPAVING.COM
  • Home
  • Paving
  • Sealcoating
  • Striping
  • Patching
  • Crack Filling
  • Request an Estimate
  • Contact Us
  • More
    • Home
    • Paving
    • Sealcoating
    • Striping
    • Patching
    • Crack Filling
    • Request an Estimate
    • Contact Us

AUTUMNPAVING.COM

  • Home
  • Paving
  • Sealcoating
  • Striping
  • Patching
  • Crack Filling
  • Request an Estimate
  • Contact Us

PATCHING

Request an Estimate

Overlay Patch

Overlay Patch before


  An overlay patch is appropriate for parking lots and driveways that still have a relatively sound foundation.  An overlay patch will have raised seams and are less expensive than saw-cut patches because they require less time and materials and do not require the use of an asphalt saw.  The process for installing an overlay patch is as follows:

Overlay Patch After

 

  • Clean blacktop of loose debris.
  • Apply tack coat asphalt adhesive which enables proper bonding between new and old asphalt.
  •  Prefill designated area with asphalt and compact to level area as needed.
  • Install asphalt to adequately cover area tapering edges down to meet existing asphalt.
  • Compact with roller.

Saw-cut Patch

Saw-Cut Patch Before

 A saw cut patch requires some foundation / stone work and the use of an asphalt saw.  These patches also require more asphalt than an overlay patch, usually 3" - 4" of asphalt.  Notice that the edges of the patch are flush with the existing blacktop.  The process for installing a saw-cut patch is as follows: 

Saw-Cut Patch Afer

 

  • Saw-cut and remove existing blacktop.
  • Re-grade and compact existing stone base or dig-out existing stone base and reinstall crusher run stone.
  • Compact stone base.
  • Install 2.5" of type 3 dense binder and compact.
  • Install 1.5" of type 7F commercial grade asphalt and compact flush with existing blacktop.


Copyright © 2021 AUTUMNPAVING.COM - All Rights Reserved.